Cold Chain & Cold Storage Operations Summit
Wed–Fri · Oct 8–9, 2026 · Hilton Oak Brook Hills · Chicago

Reduce Failures, Prevent Excursions, and Increase Uptime Across Your Cold Chain

A practitioner-led summit for cold storage operators, cold chain leaders, and the design-build teams delivering new builds and expansions. Align on specs, commissioning, cutover, and handoff standards that protect uptime, throughput, and service levels.

111 delegate seats 14 paired case studies Curated 1:1 meetings No trade show floor

This is not a trade show. Delegate seats are capped to keep the room senior and implementation-focused. Solution providers participate through curated 1:1 meetings only.

Proven format
FMA Summits has delivered 35+ curated summits for Fortune 500 operators since 2007. This inaugural summit follows the same format operators already trust.
Operators Design-build Developers Supply chain leaders 111 delegates

Operator reality ↔ design-build solutions

Cold storage demand is outpacing supply. Operators, shippers, and developers face pressure to expand capacity while maintaining uptime and preventing temperature excursions. This summit pairs what failed in real facilities with the fixes that prevented recurrence—and ties each decision to downstream service levels, dwell time, and throughput.

Handoff standardsTurnover packages that prevent year-two failures.
Commissioning checklistsInspection points and go-live gates that protect uptime.
Excursion playbooksDetection, response, recovery—under real traffic.
Spec alignmentOperator requirements translated to buildable specs.
Cutover & rollback plansAutomation and software transitions with contingency.
Curated introsMeet relevant solution teams without the trade show noise.
Delegate titles
  • VP/Director of Cold Chain Operations
  • VP/Director of Supply Chain
  • VP/Director of Engineering
  • Capital Projects / Construction Leaders
  • Facilities Planning / Refrigeration
  • Cold Storage GMs / Network Planning
  • Developers / Investors / REITs
Industries
  • 3PL cold storage operators
  • Food & beverage manufacturers
  • Foodservice distribution
  • Grocery & retail DCs
  • Meat & poultry processors
  • Pharma / life sciences
  • E-commerce / last-mile
Solution providers
  • Refrigeration OEMs + controls
  • Automation + material handling
  • Design-build + MEP + commissioning
  • Envelope + insulation + panels
  • Doors, docks, infiltration
  • Power systems + resilience
  • Fire protection + compliance
Topics covered
  • Grid resilience + backup power
  • Redundancy + excursions
  • Automation commissioning
  • Envelope + vapor continuity
  • Dock + infiltration control
  • Fire protection + AHJ
  • Energy + demand charges
Format clarity

What this summit is — and what it’s not

Built for operators who need answers, not brochures.

Not this

×
A vendor expo with booths and foot traffic
×
A 300-person conference where nobody connects twice
×
Generic “best practices” with no facility specifics
×
Theory-first panels with no implementation roadmap

This

111 operators/builders aligned on preventing failures
14 paired case studies: what failed ↔ the fix that worked
Curated 1:1 meetings with relevant solution teams
Commissioning, handoff, cutover, and excursion playbooks
Delegates speak

Why operators trust FMA Summits

Real operators explain the format. This inaugural summit follows the same proven structure.

Operator perspective
Best facilities-focused event
One room, real operators, takeaways you can use Monday.
Brendan Sullivan
Estée Lauder Companies
Energy & infrastructure
Consistent value year after year
Curated discussions and relationships that convert to execution.
Steven Driver
Sanofi
Resilience
Learning across sectors
Concise sessions with peer insight you can bring back.
Scott Bonhoff
FBI
Sustainability
Deep conversations that stick
1:1s, concise talks, relationships that create outcomes.
Matt Emden
Principia College
Fit

Who this summit is built for

A working room for leaders responsible for uptime, capacity, and expansion outcomes—whether you operate cold storage, build it, or manage the supply chain that depends on it.

If any of these are on your desk, you belong in the room

New build or expansionAlign specs and commissioning early so “year-two failures” never happen.
Uptime risk & temperature excursionsRedundancy, monitoring, alarm maps, and response playbooks under real traffic.
Automation and software cutoverCommissioning, rollback planning, and WMS/WCS integration that protects throughput.
Energy costs & demand chargesLoad management strategies that reduce $/case without adding risk.
3PL strategy & network planningBuild vs lease, site selection, SLAs, and decisions tied to real uptime data.
Service levelsDesign choices translated into SLA performance, dwell time, and resilience.

What you leave with

  • Commissioning & turnover deliverables list
  • Spec standards to share across teams/sites
  • Uptime & outage-response playbook templates
  • Redundancy & monitoring “must-haves”
  • Expansion & phasing decision framework
  • Curated intros to relevant solution teams
See the paired case studies
Case studies

14 paired case studies (operator reality ↔ design-build fix)

Each item expands to show OPS (what failed) and DB (what to spec, build, commission, and turn over to prevent recurrence). Every failure is tied to throughput, dwell time, and service levels.

Operations caseOPS

Outage playbooks: drills, failover, downtime minimization

Operator case study · 20 minutes

Drills, staffing, escalation, monitoring, and recovery sequences that prevent excursions and protect order cutoffs.

Design-build fixDB

Generator vs microgrid: sizing for refrigeration loads

Design-build solution · 20 minutes

Inrush, startup sequencing, load shedding, runtime math, and restart-ready design. Sponsors: power systems, generators, microgrids.

Operations caseOPS

Excursions: root causes, detection, recovery under traffic

Operator case study · 20 minutes

Trigger, detection, response, and the fix that eliminated recurrence—including claims and service impacts.

Design-build fixDB

Ammonia / CO2 redundancy: practical designs

Design-build solution · 20 minutes

Remove single points of failure and define alarm maps. Sponsors: refrigeration OEMs, controls, monitoring.

Operations caseOPS

AS/RS cutover failures: what broke and how throughput was stabilized

Operator case study · 20 minutes

Integration failures, downtime risk, and operational changes that protected shipping windows.

Design-build fixDB

Cutover + rollback: handoff plans that prevent downtime

Design-build solution · 20 minutes

Staging, commissioning, rollback scenarios, and go-live sequencing. Sponsors: automation, material handling, WMS/WCS.

Operations caseOPS

Condensation, frost, and ice under live traffic

Operator case study · 20 minutes

Penetrations and transitions that failed and the maintenance burden that followed.

Design-build fixDB

Vapor detailing: inspection points and handoff checklist

Design-build solution · 20 minutes

Roof, wall, transitions, joints, thermal breaks, and QC. Sponsors: insulation, envelope, panel systems.

Operations caseOPS

Infiltration under volume: what holds up at scale

Operator case study · 20 minutes

High-cycle door performance, frost management, and excursion prevention during peak shipping windows.

Design-build fixDB

Door and dock specs that prevent condensation

Design-build solution · 20 minutes

Spec, placement, airflow, and controls that stop infiltration failures. Sponsors: doors, dock equipment, seals.

Operations caseOPS

As-builts didn’t match reality: what it cost

Operator case study · 20 minutes

Documentation gaps, training gaps, missing spares, alarm maps—and the downtime they caused.

Design-build fixDB

The handoff package: tests, training, spares, alarm maps

Design-build solution · 20 minutes

What must be delivered at turnover so the facility runs on day one and year two. Sponsors: DB/MEP, commissioning.

Operations caseOPS

Floor heave, cracking, and frost damage: year-two failures

Operator case study · 20 minutes

What happens when insulation, drainage, or thermal breaks fail under load and traffic.

Design-build fixDB

Under-slab design: insulation, drainage, thermal breaks

Design-build solution · 20 minutes

Spec, installation, and inspection protocols that prevent costly repairs. Sponsors: flooring, coatings, insulation.

Operations caseOPS

Lighting failures in freezer environments: what breaks and why

Operator case study · 20 minutes

Cold temperature failures, energy waste, and maintenance burden.

Design-build fixDB

LED specs for freezer environments + controls

Design-build solution · 20 minutes

Cold-rated fixtures and controls to reduce energy without risk. Sponsors: lighting, controls, EMS.

Operations caseOPS

Moisture ingress: condensation, ice buildup, safety risk

Operator case study · 20 minutes

How uncontrolled moisture creates maintenance and safety issues under peak movement.

Design-build fixDB

Dehumidification + air locks: design that eliminates moisture

Design-build solution · 20 minutes

HVAC, dehumidification, vestibules, and air curtains that keep humidity controlled. Sponsors: HVAC, dehum, air curtains.

Operations caseOPS

Compliance surprises: what was missed and what it cost

Operator case study · 20 minutes

Violations, retrofits, and the cost of discovering gaps late.

Design-build fixDB

Fire protection specs for cold storage

Design-build solution · 20 minutes

AHJ coordination, dry vs wet systems, and inspection access. Sponsors: fire protection, detection, suppression.

Operations caseOPS

Demand charges destroying ROI: the surprise drivers

Operator case study · 20 minutes

Peak loads, startup sequences, and the real bill impact on $/case.

Design-build fixDB

Load management + thermal storage strategies

Design-build solution · 20 minutes

Controls, load shifting, thermal storage, and integration paths. Sponsors: EMS, controls, thermal storage, battery.

Operations caseOPS

Expansion mistakes: what would change if rebuilt

Operator case study · 20 minutes

Over-building, under-sizing, and phasing decisions that slowed time-to-revenue.

Design-build fixDB

Modular design + phased expansion: right-sizing for growth

Design-build solution · 20 minutes

Phasing, modular systems, infrastructure planning. Sponsors: DB/MEP, modular systems, consulting.

Operations caseOPS

Urban fulfillment failures: what broke at scale

Operator case study · 20 minutes

High-velocity order profiles, tight temp windows, and fixes that restored SLAs.

Design-build fixDB

Micro-fulfillment hubs: design for speed and food safety

Design-build solution · 20 minutes

Urban constraints, automation integration, and cold integrity. Sponsors: developers, last-mile, automation.

Operations caseOPS

Decarbonization targets without uptime risk

Operator case study · 20 minutes

Sustainability goals and refrigerant transitions under operational reality.

Design-build fixDB

Natural refrigerants + electrification: ROI and implementation

Design-build solution · 20 minutes

CO2/ammonia transitions, controls, and energy strategy. Sponsors: natural refrigerant OEMs, energy partners.

Operator-first programming: Operator case studies are finalized first. Solution provider presentations are matched to operator failures to ensure relevance.
Questions

Frequently asked questions

Common questions about format, speakers, and what makes this summit different.

This is an inaugural event — how do I know it will be good?

FMA Summits has delivered 50+ curated summits since 2018 for Fortune 500 operators. This summit follows the same format: small room, paired case studies, curated meetings, operator-first programming.

Who are the speakers?

Operator presenters are finalized first. Solution provider presentations are matched to operator failures to ensure relevance. Presenters are practitioners—no theory-only talks.

Is this a vendor trade show?

No exhibit hall, no booth traffic. Solution providers participate through curated 1:1 meetings with operators who requested to meet them.

Will I leave with usable takeaways?

Yes. You leave with commissioning checklists, handoff standards, excursion response playbooks, and spec alignment frameworks you can implement immediately.

Can I bring my team?

Yes. Team pricing is designed for the leaders who will implement: operations, engineering, capital projects, supply chain.

Refund policy?

Full refund if you cancel 30+ days before the summit. If you attend and don’t find actionable value, we’ll refund registration—no questions asked.

Bring your team. Leave with a preventable-failure playbook.

If you are expanding, automating, retrofitting, or stabilizing a live cold storage facility, this summit is engineered for alignment between operations, builders, and supply chain leaders who own service levels.

Executive discussions
Leaders networking
Relationships built
Schedule

Summit Schedule

Three days engineered for outcomes: operator case studies, working sessions, and curated 1:1 meetings tied to reliability and expansion execution.

3-Day Summit Overview

Day 1 · Wed Oct 7
Arrival, registration, partner setup
Day 2 · Thu Oct 8
1:1 meetings, case studies, private reception
Day 3 · Fri Oct 9
Morning sessions, 1:1 meetings, closing lunch
View detailed schedule
Time Day 1 · Wed Oct 7 Day 2 · Thu Oct 8 Day 3 · Fri Oct 9
7:00am Corporate dining & networking Corporate dining & networking
8:00–10:00am Operator + partner case studies Operator + partner case studies
10:00am Hosted networking (meeting room) Hosted networking (meeting room)
11:00am Operator + partner case studies Operator + partner case studies
12:00pm Pre-scheduled 1:1 meetings (lunch) Pre-scheduled 1:1 meetings (lunch)
1:00pm Operator + partner case studies Operator + partner case studies
2:00–5:00pm Partner setup & registration Curated 1:1 meetings + networking blocks Wrap-up meetings + departures
5:00–7:00pm Partner setup & arrivals Private reception + dinner

Event Location

Hilton Chicago / Oak Brook Hills Resort & Conference Center · Oak Brook, IL

A delegate-friendly venue with the space and layout to run curated 1:1s, paired case studies, and private networking built for focus and outcomes.

Hotel info & rooms →
Delegate registration

Secure your seats

Full access to the program, meals, receptions, and curated introductions with solution providers relevant to cold storage operations and expansion.

Only 111 delegate seats
Team pricing: 3–5 delegates at $1,850 / person
SeatsPackageInvestmentBest for
1 Solo delegate
$2,900
(per delegate)
One leader evaluating options or standards. Buy 1 seat
2 Two-person team
$5,800
(total)
Facilities + engineering attending together. Buy 2 seats
3 Core leadership team
$5,550
(total)
Ops, engineering, capital projects aligning on execution. Buy 3 seats
4 Project squad
$7,400
(total)
Refrigeration, power/energy, ops as one decision unit. Buy 4 seats
5 Enterprise team
$9,250
(total)
Multi-site standards across a portfolio. Buy 5 seats

Satisfaction guarantee

Attend the summit. If you don’t find actionable takeaways you can implement immediately, we’ll refund your registration—no questions asked.

Utilities

Add to calendar and share

Increase attendance by putting the dates on calendars—and invite the teammate who will implement with you.

Add the dates to your calendar

After registration, we email reminders and calendar links closer to the summit.

BEGIN:VCALENDAR VERSION:2.0 PRODID:-//FMA Summits//Cold Chain Cold Storage Summit//EN CALSCALE:GREGORIAN METHOD:PUBLISH BEGIN:VEVENT UID:coldchain-coldstorage-20261007@fmasummits.com DTSTAMP:20260202T140000Z DTSTART:20261007T130000Z DTEND:20261009T210000Z SUMMARY:Cold Chain & Cold Storage Operations Summit LOCATION:Hilton Chicago Oak Brook Hills Resort and Conference Center, 3500 Midwest Rd, Oak Brook, IL 60523 DESCRIPTION:Cold Chain & Cold Storage Operations Summit\nOct 7-9, 2026\nReduce failures, prevent excursions, and increase uptime across your cold chain.\n END:VEVENT END:VCALENDAR

To use ICS: copy into a file named cold-chain-summit.ics, then open it with your calendar app.

Invite the teammate who will implement with you

Copy link: highlight your page URL in the browser address bar and copy it. (No JavaScript required.)

Next step

Pick your seats. Bring the people who will execute with you.

If you own uptime, commissioning, refrigeration reliability, power resilience, automation cutover, expansion execution, or cold chain network strategy, this room is designed for you. The highest ROI comes from attending with the leaders who will implement when you get back.

Secure seats now

Seats limited to 111 delegates. Solution providers participate through curated meetings only.

Delegate seats
1–2 delegates: $2,900 · 3–5 delegates: $1,850 per person · All meals & meetings included.